• Home
  • Top Stories
  • News
    • Photo News
  • Politics
  • Business
  • Crime & Security
  • Sports
  • Intimacy
  • About Us
    • Contact Us
    • Privacy Policy
    • Advert Rate
  • More
    • Opinion
    • Lifestyle & Entertainment
    • Foreign News
    • Health
Facebook Twitter Instagram
Saturday, November 7
Facebook Twitter Instagram
Prompt News
  • Home
  • Top Stories
      Featured

      Police nab four fathers over alleged plot to use their children for money rituals

      Crime & Security November 6, 2026
      Recent

      Police nab four fathers over alleged plot to use their children for money rituals

      November 6, 2026

      Ex-Banker allegedly diverts Customer’s N515 million

      November 6, 2026

      Sacking David Mark- led ADC Leadership politically motivated – Atiku

      November 5, 2026
    1. News
      1. Photo News
      Featured

      FG builds 21 veterinary hospitals, targets livestock disease control

      News November 6, 2026
      Recent

      FG builds 21 veterinary hospitals, targets livestock disease control

      November 6, 2026

      Tinubu mocks Obi over Anambra erosion, boasts of confronting Atlantic Ocean

      November 6, 2026

      10 Key Things to Know about Justice Lifu’s Judgment Affecting ADC, Atiku, By Abdulrahman Abdulaziz

      November 6, 2026
    2. Politics
        Featured

        2027: Yilwatda in Ekiti, seeks overwhelming support for Tinubu, others

        Politics November 6, 2026
        Recent

        2027: Yilwatda in Ekiti, seeks overwhelming support for Tinubu, others

        November 6, 2026

        Sacking David Mark- led ADC Leadership politically motivated – Atiku

        November 5, 2026

        Obi slams court ruling voiding Atiku’s ADC candidacy

        November 5, 2026
      1. Business
          Featured

          JAIZ Bank denies involvement in ₦104m Investment Fraud in Jos branch

          Business November 4, 2026
          Recent

          JAIZ Bank denies involvement in ₦104m Investment Fraud in Jos branch

          November 4, 2026

          OAGF Strengthens Control on Admission of newly recruited Employees into Federal payroll

          November 2, 2026

          Nigeria, China Sign $30m Deal on Grassroots Development

          November 2, 2026
        1. Crime & Security
            Featured

            Retired Supreme Court justice recounts EFCC ordeal, says she faced corruption probe

            Crime & Security November 6, 2026
            Recent

            Retired Supreme Court justice recounts EFCC ordeal, says she faced corruption probe

            November 6, 2026

            Alaafin declares self number one Yoruba monarch

            November 6, 2026

            50-year-old man killed, body burnt in dry well

            November 6, 2026
          1. Sports
              Featured

              AFCON 2027Q: Osimhen set to miss Super Eagles’ double-header against Tanzania

              Sports November 6, 2026
              Recent

              AFCON 2027Q: Osimhen set to miss Super Eagles’ double-header against Tanzania

              November 6, 2026

              FIFA U17 Women’s World Cup: Flamingos vow to crush Japan as history beckons

              November 6, 2026

              2026 U-17 WWC: Dikko, Olopade to head FG delegation for Flamingos’ final

              November 6, 2026
            1. Intimacy
            2. About Us
              • Contact Us
              • Privacy Policy
              • Advert Rate
            3. More
              • Opinion
              • Lifestyle & Entertainment
              • Foreign News
              • Health
            Prompt News
            Home » Nigeria’s Power Problem Is Real; So Is The Progress Under Tegbe, By Tony Erha
            Opinion

            Nigeria’s Power Problem Is Real; So Is The Progress Under Tegbe, By Tony Erha

            Prompt NewsBy Prompt NewsOctober 4, 2026Updated:October 4, 2026No Comments6 Mins Read
            Facebook Twitter LinkedIn Telegram Pinterest Tumblr Reddit WhatsApp Email
            Share
            Facebook Twitter LinkedIn Pinterest Email

            There is no debate about Nigeria’s power crisis.

            Millions still live on generators and inverters. Businesses run below capacity. Communities endure long outages. The national grid is fragile, and the gap between installed capacity and actual supply remains painfully wide.

            Managing Director of Leadership Newspapers and columnist, Azu Ishiekwene, is right about the problem. Nigeria has not solved its electricity crisis. No serious Minister of Power should pretend otherwise.

            But a system can be deeply broken and still begin to move in the right direction.

            That distinction is essential in assessing Joseph Tegbe’s first 100 days.

            A minister who has spent barely three months in office cannot be expected to fix a failure of decades. He cannot be judged as if he inherited a working market, nor should he be dismissed because the lights have not suddenly come on everywhere.

            The fair question is: what has actually changed?

            —What Tegbe inherited—

            Tegbe did not inherit an empty cupboard. He inherited a structurally weak sector.

            Nigerian Electricity Regulatory Commission [NERC] data for April 2026 puts installed grid-connected capacity at 13,625MW. Average available capacity that month was just 4,286MW. Only about a third was available for dispatch.

            That is the crisis in one number.

            The financials are worse. The sector’s debt backlog is about N3.3 trillion, with only 27% of GenCos’ invoices being paid. That chokes gas supply, generation, and maintenance across the entire value chain.

            His predecessor admitted it. In January 2025, then Minister Adelabu described the grid as old and dilapidated, saying government was merely managing it pending a major overhaul. Grid disturbances were frequent. In April 2024 alone, Nigeria had suffered its fifth collapse of the year.

            The starting point was ugly.

            —What has actually moved—

            Start with generation.

            Before June, generation and transmission hovered between 3,700MW and 4,700MW. In the weeks before Tegbe’s 100-day briefing in September, it crossed 5,000MW, with a peak of 5,330MW in August and September.

            That does not mean 24-hour power. It does mean a measurable shift at system level.

            NERC’s August factsheet corroborates it: average available capacity of 4,758MW, with 4,102MW utilised.

            Then Alaoji. A 375MW plant offline for three years is now back on the grid.

            On transmission, interventions in Lagos and Abuja have unlocked 912MW of additional capacity – 672MW from new transformers at Apapa, Ijora, Alausa and Lekki, and 240MW from a 300MVA transformer at Katampe.

            These are not promises. They are physical additions to the system. They will not light up every home tomorrow, but they cannot be dismissed because Wuse Market still runs generators.

            Another telling intervention: over 300 containers of critical power equipment, long stranded at the ports, have been released for inspection and deployment. It is a quintessentially Nigerian paradox – unfinished projects in the field, equipment stuck in ports. Moving them is unglamorous, but essential.

            —Metering, money and the hidden work—

            Consider 350,000.

            That is the number of meters installed in Tegbe’s first 100 days, taking cumulative installations to 1,004,260 as of August 2026. Resolution of litigation around the AMMON programme has also unlocked procurement of 1.4 million smart meters, while 5,000 young Nigerians are being trained as installers.

            READ ALSO:

            • FG builds 21 veterinary hospitals, targets livestock disease control
            • Retired Supreme Court justice recounts EFCC ordeal, says she faced corruption probe
            • Alaafin declares self number one Yoruba monarch
            • AFCON 2027Q: Osimhen set to miss Super Eagles’ double-header against Tanzania
            • 50-year-old man killed, body burnt in dry well

            A meter does not generate power, but it fixes one of the market’s most corrosive problems: estimated billing. It makes consumption measurable, billing defensible, and revenue more transparent.

            Then liquidity.

            The Federal Government has raised N1.23 trillion towards the N3.3 trillion debt backlog. It does not clear the debt, but it is a substantial injection into a value chain whose illiquidity threatened collapse. The Presidency had earlier confirmed a phased settlement of verified legacy debts through the domestic capital market.

            Along the Ikorodu-Sagamu industrial corridor, interventions are targeting energy theft and revenue losses estimated at N120 billion annually. No ribbon-cutting, but critical work.

            Power reform is often like that. The most consequential gains happen inside the machinery before consumers feel them.

            —The freezer is not the story—

            Tegbe’s “freezer” comment – that some areas now enjoy up to 18 hours, with residents joking that their freezers are freezing too much – has been blown out of proportion.

            As a national claim, it would be absurd. Nigeria is not on 18 hours of supply.

            Tegbe himself has clarified: system-wide improvement does not mean improvement on every feeder.

            That is the reality of the grid. One location can have 18 hours while another is in darkness. The country can hit 5,330MW at peak while a factory still runs diesel. Lagos and Abuja can gain transmission capacity while another cluster suffers.

            All three can be true at once.

            Something has changed. It simply has not changed everywhere.

            The real test is not the anecdote. It is whether early, localised gains can be converted into sustained, wider, commercially viable supply.

            —The harder test—

            Pretending Tegbe has fixed power in 100 days is dishonest. He has not.

            Giving him a free pass because generation crossed 5,000MW is also wrong.

            But claiming nothing has changed is equally dishonest. The evidence says otherwise: A 375MW plant back on the grid. 912MW of transmission capacity unlocked. Generation peak of 5,330MW. About 350,000 meters in 100 days. Over one million cumulatively. N1.23 trillion mobilised for debts. Over 300 containers of equipment released. Specific transmission corridors and a Super Grid proposal outlined for the next phase.

            What matters now is what Tegbe does with this acknowledgement that national numbers do not invalidate local pain. That is a useful stance for a minister – it respects the difference between a spreadsheet and a household.

            Nigeria does not need another minister who declares victory because a graph moved. It needs one who takes a moving graph and keeps pushing until it becomes a lived experience.

            That is the burden on Tegbe’s desk.

            The problems are formidable. Expectations are huge. Patience is thin.

            Three months is enough to show direction. It is not enough to deliver transformation.

            The power sector is still broken.

            But the machinery is beginning to move.

            ● Comrade Tony Erha is a journalist and columnist.

            electricity Joseph Tegbe power sector
            Share. Facebook Twitter Pinterest LinkedIn Tumblr Telegram Email
            Previous ArticleBBNaija S11: Temi Nkem Emerges Winner
            Next Article Kidnappers torture 20 NYSC members, cut ransom to N5m each
            Prompt News

              Related Posts

              Inside The Ka’abah: A Rare Honour And The Message From Makkah

              November 4, 2026

              2027: The 2.5 Million Votes And Others That Do Not Add Up

              November 4, 2026

              BENUE ZONE C: Four Contenders, One Senate Seat – Will the Best Candidate Win? By Dahiru Ali

              November 3, 2026
              Add A Comment

              Comments are closed.

              Recent Posts
              • FG builds 21 veterinary hospitals, targets livestock disease control
              • Retired Supreme Court justice recounts EFCC ordeal, says she faced corruption probe
              • Alaafin declares self number one Yoruba monarch
              • AFCON 2027Q: Osimhen set to miss Super Eagles’ double-header against Tanzania
              • 50-year-old man killed, body burnt in dry well

              CONTACT INFORMATION

              Prompt News Online is published by PNO Dynamic Media Limited.

              Address: Suite 24, Abebi Plaza, Oluseyi, Sango – Eleyele Road, Ibadan, Oyo State, Nigeria.

              Managing Editor/CEO: Akeem Oyetunji

              Email: promptnewsonline@gmail.com or editor@promptnewsonline.com

              Phone/WhatsApp: +234806 286 2057
              Or 0805 386 6284

              ABUJA OFFICE: 
              Address: Suite D76, EFAB Mall
              Off Gimbya Street, Area 11, Garki, Abuja
              ABUJA BUREAU EDITOR: Harry Awurumibe
              Phone: 0803 302 4300
              Email: harryawurumibe360@gmail.com
              UK OFFICE:
              Address: 34 Skipper Court,
              Abbey Road, IG 11 7GW.
              Barking, London, UK.
              EDITOR EUROPE: Bolaji Oyegunle
              Phone +447878196776
              Email: gb10oyegunle@gmail.com
              © 2026 Prompt News Online. Designed by DeedsTech.
              • About Us
              • Contact Us
              • Advert Rate
              • Privacy Policy

              Type above and press Enter to search. Press Esc to cancel.